Liuhua19-5 gas field development: A successful subsea tie back solution

摘要:Liuhua 19-5 gas field is a two subsea well head marginal field. The development is through subsea tie back technology. The field is located 240km to the south east of Hong Kong with 200m water depth. During the execution of the project, several challenges were met such as delayed delivery of long lead items resulted in re-alignment of most offshore installation activities. The topside modification to the existing platform also encounters problems, such as safety issues, late stage project scope changes. Quality issues for some local products stretched the pre-commissioning time, cracks on the slug catcher vessel after heat treatment etc. Various measures were taken to solve those difficulties. The project achieved its target startup date with overall effective control on schedule, cost, safety and quality. There are also four China first use technology been successfully implemented.
© Copyright 2016 by the International Society of Offshore and Polar Engineers (ISOPE).

ISSN号:1098-6189

卷、期、页:v 2016-January,p894-898

发表日期:2016-01-01

期刊分区(SCI为中科院分区):无

收录情况:EI(工程索引)

发表期刊名称:Proceedings of the International Offshore and Polar Engineering Conference

参与作者:冒加友,杨建军

第一作者:宫敬

论文类型:会议论文

论文概要:冒加友,杨建军,宫敬,Liuhua19-5 gas field development: A successful subsea tie back solution,Proceedings of the International Offshore and Polar Engineering Conference,2016,v 2016-January,p894-898

论文题目:Liuhua19-5 gas field development: A successful subsea tie back solution